Crypto
Ethereum details Glamsterdam’s planned October 6 activation on Sepolia

The facts
On September 28, the Ethereum Foundation published details of Glamsterdam’s planned Sepolia activation on October 6 at 13:53:36 UTC; the schedule had already appeared in the official repository on September 17. The upgrade includes proposer/builder separation and block access lists. Operators must update execution and consensus clients.
What changes for capital
The test provides a chance to evaluate the upgrade before a potential mainnet activation.
The scenarios
If testing completes the intended checks, it will provide evidence for evaluating the change. If failures arise, the testnet date must not become a promise of mainnet activation.
The next signal
Check the Sepolia test outcome and official communications on issues and next steps.
Verification and limits
This is a testnet upgrade. Hoodi and mainnet dates remain pending. The page displays September 28, although its URL contains September 17. The scenarios are conditional editorial inferences, not verified facts or forecasts. The cited sources support the facts; the next signal proposes checks still to be made.
Video context
Archive: Ethereum Foundation · 2022-10 · English. Technical background on proposer/builder separation; not a description of all current Glamsterdam specifications.
Watch on the original channel ↗